We had them extend our driveway and pour a new pad for our outdoor kitchen. Rodney kept everything moving and answered my questions when I called. Job came out great
Brandon Landry Verified · Parish Outdoor Builders website
Patios, driveways, RV and boat pads and structure slabs in Gonzales, Prairieville and Donaldsonville and across the Ascension Region. 3,500 PSI concrete and fiber in every pour, same-day proposals after a free walkthrough, and the proposal price is the price.
Patios, driveways, RV and boat pads and structure slabs in Gonzales, Prairieville and Donaldsonville and across the Ascension Region. 3,500 PSI concrete and fiber in every pour, same-day proposals after a free walkthrough, and the proposal price is the price.
Pour it once, pour it right. One firm price in writing, usually the same day we walk it.
Call 225.396.5207Most concrete companies make you sit through a sales visit before you see a number. Not here. Set your size and finish below and your estimate shows up right now — and every price includes 3,500 PSI concrete with fiber, excavation, framing, the pour and expansion joints where required.
Rebar is available as a quoted add-on. Pricing assumes typical residential lots with limited grade changes — extensive grade changes get priced separately.
Length times width. A 20 by 25 foot patio is 500 sq ft. A 12 by 60 foot driveway is 720. Bigger than 3,000? Type it in.
This pour hits our $2,500 minimum, so that is what the concrete prices at. Concrete plants charge a short-load fee on small orders (roughly anything under 225 square feet). That fee is why small pours have a minimum. Tear-out, if any, is added on top.
Planning estimate, not a quote. Monthly figure assumes 7.8% fixed over 20 years through HFS Financial ($3,000 minimum loan) and is not an offer of credit. Want the exact number? Measure your own yard on satellite in two minutes, or book the free walkthrough and get it in writing.
Get Your Instant Concrete Price Book a Free WalkthroughEvery pour is 3,500 PSI with fiber, run by one project manager from the walkthrough to the final sweep. Here is what that gets you.
Every pour is 3,500 PSI with fiber mixed in at the plant. Most bids pour 3,000 and charge extra for fiber.
For most projects, one total price in writing the same day we walk it.
No price change mid job. If we under quoted, that is on us. Only a scope change you ask for moves it.
LSLBC #063699, with over $2,500,000 in general liability and workers’ comp coverage.
On a build with this many moving parts, something will eventually go sideways. When it does, you call your project manager and it gets handled. If it is bigger than that, I come look at it myself.
“We aren’t perfect. We do make mistakes, but I promise we will fix anything and leave you satisfied when done.” — Dante Harris, Owner
Mixed in at the plant. No wire mesh.
Topsoil stripped and the base cut to grade.
Forms set to grade and slope before the truck arrives.
Placed, finished and control joints cut.
Where required, including where new concrete meets old.
Available as a quoted add-on. Ask your project manager.
Most of what we pour replaces or extends something. Every job gets the same base prep, thickness, fiber and joints.
From the walkthrough to the last sweep, one project manager runs your pour.
We measure the pour, shoot the grade and look at where water goes today.
For most projects, your full scope of work and one total price are in your inbox the same day as the walkthrough.
Your project manager handles the permit, any HOA submittal and the 811 locates.
Topsoil stripped, base cut and compacted, forms set to grade, fiber reinforced concrete poured and finished.
We walk the finished slab with you and clean up before we leave.
Planning a patio? Read what goes into a concrete patio that lasts before you get bids.
A 20 by 25 foot patio (500 square feet) is about $4,075. Pricing assumes a typical residential lot with limited grade changes.
For most projects you get a written proposal the same day as your free walkthrough. Your start date depends on any permit or HOA approval, the weather and the schedule at the time, and your project manager gives you a date once you sign. After the pour, your project manager tells you when the slab is ready for foot traffic and when it is ready for vehicles.
Every pour includes fiber mixed in at the plant, with no wire mesh. Fiber is spread through the whole slab and helps control shrinkage cracking as the concrete cures. Rebar is available as a quoted add-on — ask your project manager and it goes into your proposal.
It depends on the work and on who has jurisdiction over your address: inside city or town limits it is usually the municipality, outside them the parish. Your project manager confirms which office covers your address and handles the permit, any HOA submittal and the 811 locate call. Each parish page below lists the local permit offices.
Fiber in every pour, excavation, framing, the pour and expansion joints where required. Demo and haul-off of existing concrete, stained or stamped finishes, RV and boat pads and rebar are priced as separate line items.
We pour concrete across Ascension Parish, Assumption Parish and St. James Parish. Pick your parish for local permit offices and pricing examples.
Every photo is our own work, shot on the job.
Finance the slab on its own or roll it into a bigger backyard build with one monthly payment. HFS Financial is our financing partner on every project.
Financing is provided by HFS Financial and is subject to credit approval. Rates, terms and amounts vary by applicant and can change.
Free walkthrough, no obligation. For most projects your written proposal arrives the same day.
225.396.5207Monday to Friday 8a to 5p. Saturday 9a to 1p.
“Concrete is the one thing in your yard you cannot redo cheaply, so we pour it right the first time: 3,500 PSI, fiber in every load and a project manager who answers the phone.”
Dante Harris, Chief Backyard Officer