We had them extend our driveway and pour a new pad for our outdoor kitchen. Rodney kept everything moving and answered my questions when I called. Job came out great
Brandon Landry Verified · Parish Outdoor Builders website
Driveways, patios and structure slabs in Opelousas — permitted with the City of Opelousas and poured to drain. 3,500 PSI concrete and fiber in every pour, Same Day Proposals (for most projects) and no price change mid job. The licensed and insured concrete contractor in Opelousas that publishes its prices up front.
Opelousas is home to St. Landry Parish Government, with older homes near downtown, postwar neighborhoods and rural property on the edges of town. A lot of our work here is replacing old, cracked driveways, adding patios behind older homes and pouring slabs for carports and pavilions. Tear-out and re-grading are part of many jobs, so we price the old concrete coming out along with the new pour.
Inside city limits, the City of Opelousas Code Enforcement Office at 105 North Main Street handles permits. Outside city limits, the St. Landry Parish Permits Office on South Court Street does, and in flood zones A and AE it requires an elevation certificate. A driveway onto US 190 needs a DOTD permit.
We pour all over Opelousas, including along I-49 and US 190 (Landry Street). ZIP codes we cover here include 70570.
Pour it once, pour it right. One firm price in writing, usually the same day we walk it.
Call 225.396.5207Length times width. A 20 by 25 foot patio is 500 sq ft. A 12 by 60 foot driveway is 720. Bigger than 3,000? Type it in.
This pour hits our $2,500 minimum, so that is what the concrete prices at. Concrete plants charge a short-load fee on small orders (roughly anything under 225 square feet). That fee is why small pours have a minimum. Tear-out, if any, is added on top.
Planning estimate, not a quote. Monthly figure assumes 7.8% fixed over 20 years through HFS Financial ($3,000 minimum loan) and is not an offer of credit. Want the exact number? Measure your own yard on satellite in two minutes, or book the free walkthrough and get it in writing.
Measure My Yard For An Exact Price Book My Free WalkthroughEvery pour is 3,500 PSI with fiber, run by one project manager from the walkthrough to the final sweep. Here is what that gets you.
Every pour is 3,500 PSI with fiber mixed in at the plant. Most bids pour 3,000 and charge extra for fiber.
For most projects, one total price in writing the same day we walk it.
No price change mid job. If we under quoted, that is on us. Only a scope change you ask for moves it.
LSLBC #063699, with over $2,500,000 in general liability and workers’ comp coverage.
On a build with this many moving parts, something will eventually go sideways. When it does, you call your project manager and it gets handled. If it is bigger than that, I come look at it myself.
“We aren’t perfect. We do make mistakes, but I promise we will fix anything and leave you satisfied when done.” — Dante Harris, Owner
Most of what we pour replaces or extends something. Every job gets the same base prep, thickness, fiber and joints.
From the walkthrough to the last sweep, one project manager runs your pour.
We come out to your Opelousas property, measure the pour, shoot the grade and look at where water goes today. We talk through anything else you might build on or around the slab later, so it gets poured ready for it.
For most projects, your full scope of work and one total price are in your inbox the same day as the walkthrough. That price does not change mid job — if we under quoted, that is on us, not you. The only thing that moves it is you changing the scope.
Your project manager handles the City of Opelousas Code Enforcement Office permit, any HOA architectural submittal, and the 811 locate call before anyone digs. You do not make a single one of those calls.
Topsoil stripped, base cut and compacted, forms set to grade, fiber-reinforced concrete poured and finished, control joints cut on time. Old concrete, if any, is broken out and hauled off first.
We walk the finished slab with you and clean up before we leave. Keep traffic off it while it cures and it will outlast the house.
Planning a patio? Read what goes into a concrete patio that lasts before you get bids.
Yes. Parish Outdoor Builders is a licensed and insured concrete contractor in Opelousas (LSLBC #063699), carrying a combined $2,500,000 general liability and workers’ comp policy. One project manager runs your pour from the free walkthrough to the final walkthrough, and the proposal price is the price — no change mid job unless the scope changes.
Inside city limits the City of Opelousas Code Enforcement Office issues permits; outside them it is the St. Landry Parish Permits Office. A driveway onto US 190 also needs a LA DOTD permit.
Tearing out 400 sq ft of old concrete at $3.50/sq ft is $1,400, and the new 400 sq ft slab at $8.15/sq ft is $3,260, for $4,660 total.
Outside city limits the parish lists 337-407-0950 for culverts on parish roads and 337-948-0253 for state highways. We coordinate the culvert with the pour.
Every pour includes 3,500 PSI concrete, fiber, excavation, framing, the pour and expansion joints. A 20 by 25 foot patio (500 square feet) is about $4,075.
Concrete will develop hairline cracks — that is what control joints are for. Every pour gets 3,500 PSI concrete with fiber, a prepared base and expansion joints where required, and rebar can be quoted on request.
Every photo is our own work, shot on the job.
Finance the slab on its own or roll it into a bigger backyard build with one monthly payment. HFS Financial is our financing partner on every project.
Financing is provided by HFS Financial and is subject to credit approval. Rates, terms and amounts vary by applicant and can change.
Free walkthrough, no obligation. For most projects your written proposal arrives the same day.
225.396.5207Monday to Friday 8a to 5p. Saturday 9a to 1p.
“Concrete is the one thing in your yard you cannot redo cheaply, so we pour it right the first time: 3,500 PSI, fiber in every load and a project manager who answers the phone.”
Dante Harris, Chief Backyard Officer